Landslides Cause Lumding Badarpur Railway Disruption in Assam
Heavy rains in Dima Hasao have triggered landslides, causing a Lumding Badarpur railway disruption that affects connectivity to Tripura and Mizoram.

Torrential rains in Assam’s Dima Hasao district have caused a major Lumding Badarpur railway disruption due to frequent landslides and soil erosion. This vital mountain route serves as a critical lifeline, providing essential connectivity for the Barak Valley, Tripura, Mizoram, and parts of Manipur to the rest of the country.
The instability of the terrain has led to significant operational challenges throughout 2026. In July, heavy rainfall caused a landslide near the New Harangajao Railway Station, damaging approximately 200 meters of track on both Line 1 and Line 2. This forced a suspension of services on those specific lines. To mitigate perennial erosion, the Northeast Frontier Railway (NFR) deployed geobags near the 118/1 to 118/3 kilometer markers. During the repair period, train operations were maintained through Line 3 under strict speed limits and enhanced safety protocols.
Safety and Restoration Efforts
The corridor's volatility was further evidenced on October 29, 2026, when the Silchar–Guwahati Express derailed between the Badarpur and Sukritipur stations. While the incident was serious, prompt restoration efforts meant no casualties were reported. Beyond the rail lines, regional infrastructure, including sections of NH-27, continues to face difficulties due to weather-related debris. Railway officials have emphasized that passenger safety is the top priority, advising travelers to check the latest train status before starting their journey.